A Bradford company - serving Mesquite, NV
A remodeled primary bathroom with a soaking tub and a walk-in shower

Vanities, Tile & Fixtures in Mesquite, NV

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
A remodeled hall bathroom with patterned floor tile and painted walls
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Vanities, Tile & Fixtures in Mesquite, NV

A bathroom vanity, tile, and fixture package in Mesquite typically runs $3,200 to $9,500 for a full tear-out and replacement, and $1,100 to $2,800 for a vanity-and-top swap with no tile work. That price includes the set-in-place work: setting the cabinet, cutting the Silestone or Caesarstone top, laying floor and shower tile over a proper substrate, and hanging a new Kohler or Moen faucet with a verified shutoff behind it. What you’re really buying is a crew that measures twice, plumbs the tile, and hands you a written price before anyone lifts a pry bar.

This page covers the pieces of a bathroom remodel that live and die on installation detail. A vanity that isn’t level pulls away from the wall. Tile set on a soft or wet substrate cracks at the grout line within two winters. A fixture hung on a shutoff valve that’s frozen open can flood a hallway. We handle this specific work under our full Bathroom Remodeling in Mesquite service, and if you’re planning the bigger job, start there. For just the vanity, tile, or fixture package, call Bradford Remodeling Mesquite at (844) 761-8665.

We’re part of the Garrison Partners family, independently owned and operated, and held to The Garrison Standard: every price in writing before any work starts, background-checked and uniformed technicians on the job, and a live person answering the phone at any hour. Our technicians have up to 22 years of experience. That experience matters most on the boring parts – the substrate, the rough-in, the waterproofing – which is exactly where cheap work fails.

A tile setter installing wall tile in a shower

When You Need Vanities, Tile & Fixtures

Most homeowners call us for one of these reasons, and the pattern holds across Mesquite:

  • The vanity is failing at the seams. Particleboard boxes swell and delaminate in bathrooms with a shower running twice a day. Once the toe-kick is soft enough to press a thumb into, the cabinet’s done, and no amount of caulk holds it.
  • The tile is cracking at the grout lines. In Mesquite specifically, we see this often on floors set directly over a wood subfloor that swells and shrinks through the monsoons. Grout cracks in a straight line are a sign the substrate moved, not a sign the grout was bad.
  • You want a shower you can actually clean. Fiberglass surrounds get chalky, stain pink at the corners, and can’t be scrubbed without scratching. A porcelain or glass tile shower over a waterproofed substrate is a permanent fix, and it’s the single most requested upgrade we quote here.
  • A faucet drips no matter how hard you turn it. A worn cartridge at the shower valve is a $200 to $400 repair, not a $900 one. But if the valve body itself is worn – common on 1980s-era fixtures – the whole rough-in needs replacing, which means opening the wall.
  • Your shutoff valve underneath the sink won’t turn. A frozen angle-stop behind a vanity means nobody can shut off the water without cutting the main. That’s a fixture-and-rough-in job, and it’s the one thing on this list we’d tell you not to ignore.
  • You’re updating to sell, or just got tired of the 1990s. A vanity swap with a quartz top and a Moen faucet is the single highest-return bathroom update on the market, and it’s a two-day job if the plumbing is sound.

One safety note on the last item: the shutoff valve and the shower valve body sit on pressurized water lines, and a botched rough-in can flood a wall cavity overnight. That’s a job for a licensed plumber or a trained technician, not a weekend project with a YouTube video. We flag it because we’ve had to open walls behind homeowners who tried.

Our Vanities, Tile & Fixtures Process

Every job follows the same sequence, and the sequence is the reason a Bradford bathroom closes clean. Here’s exactly what happens:

  1. Written scope and a written price. We walk the bathroom, measure the vanity opening to the quarter-inch, note the substrate under the tile, and photograph the plumbing. You get a printed price covering materials, labor, and the disposal – including what happens if we open a wall and find rot. Nothing moves at the door.
  2. Material selection from a documented roster. We spec from brands with manufacturer specs and warranties that back our own, so the paper trail is traceable. Caesarstone or Silestone quartz for the counter, Kohler or Moen for the faucet. You see the exact model numbers before the order goes in.
  3. Protection and demolition. Floors, hallways, and the doorframe get protected. The old vanity, top, tile, and trim come out, and debris leaves the same day. Background-checked, uniformed technicians do this work – you know who’s in your house before they knock.
  4. Substrate and rough-in. This is the step that’s invisible when it’s done right. The wood subfloor gets evaluated and prepped, tile gets a proper backer with waterproofing in the wet zone, and any valve or shutoff replacement happens before the wall closes. We correct the actual cause, not just the symptom.
  5. Tile, vanity, and fixture install. Tile is set, spaced, grouted, and sealed. The cabinet is leveled and shimmed so the top is dead flat. The countertop gets cut and set, the faucet hangs clean and level, and the drain and trap are tested. Everything gets caulked and wiped.
  6. Closeout with the paperwork in your hand. Clean site, documented scope, and a signed written guarantee. That’s the 365-Day Done Right Promise – if the tile, the vanity, or the fixture work fails inside a full year, we come back and correct it at no charge. That’s not a coupon; that’s a written term.

If your job is part of a bigger remodel – a kitchen, a whole home – we run the same sequence with the same documentation. You can see how it connects on our home page, and we’re happy to quote it as a single project.

A wide opening with a new beam where the kitchen wall was removed

Vanities, Tile & Fixtures Pricing in Mesquite

Here are the ranges we quote in this market. They’re real numbers, not “call for a quote,” and they’re the numbers we put in writing before work starts. Mesquite’s labor market runs a bit higher than the Las Vegas core because of travel, but material costs are steady and predictable.

Job Typical Range
Vanity only – single sink, set and level $650 – $1,400
Vanity with quartz top, cut and installed $1,100 – $2,800
Floor tile, 40-60 sq ft $1,000 – $2,400
Shower tile, over waterproofed substrate $3,200 – $6,800
Faucet, shower valve, or fixture swap $200 – $450
Shutoff valve replacement (each) $180 – $380

Three things move the number most. First, substrate condition: if the subfloor under the tile is soft or the wall behind the shower is water-damaged, that’s extra work we quote before we start. Second, tile choice: a standard porcelain set in a straight pattern is priced at the lower end; large-format, glass, herringbone, or mosaic adds labor. Third, fixture selection: a Kohler top-tier setup may be double the cost of a Moen entry model, and we’ll show you both.

Every job gets a free estimate and a written price. Call (844) 761-8665 and a live person picks up, day or night. No callbacks, no voicemail, no automated menu.

FAQs – Vanities, Tile & Fixtures

Can you do a vanity, tile, and fixture job in one visit?

A vanity swap with a new top and faucet usually fits in one day. Adding floor tile or a shower tile job runs two to five days, depending on square footage and substrate. We tell you the schedule in the written scope so you can plan.

How much does a bathroom vanity and tile install cost in Mesquite?

A vanity with a quartz top runs $1,100 to $2,800, and floor tile runs $1,000 to $2,400 for a typical 40-60 square foot bathroom. A shower tile job is the bigger ticket at $3,200 to $6,800 because it requires a waterproofed substrate. Call (844) 761-8665 for a written price specific to your bathroom.

Do you replace the shutoff valves, or just the faucet?

We check the shutoff valves on every fixture job and replace them if they won’t turn or won’t seal. It adds $180 to $380 per valve, but it’s the difference between a clean install and a flood during the next repair. We recommend it every time on valves over 15 years old.

Are your technicians background-checked and uniformed?

Yes. Every technician on a Bradford job is background-checked and uniformed, and that’s a standard set at the Garrison Partners level, not left to the job site. Our technicians have up to 22 years of experience, and every one of them works to the same written scope and same guarantee.

What does the guarantee cover?

The 365-Day Done Right Promise covers the completed work for a full year. If the tile, the vanity, or the fixture work fails inside that window, we come back and correct it at no charge. The guarantee is written, signed, and in your hand at closeout.

Does the price change at the door?

No. You get a written price before any work starts, and it doesn’t move. If we open a wall and find something we couldn’t see before – rot, a bad valve body, a soft subfloor – we show you and quote the fix before proceeding. Nothing happens without your approval.

If you’re planning a full bathroom, from the rough-in through the finish, our Bathroom Remodeling in Mesquite page walks through the full scope. For a straight vanity, tile, or fixture job, call us directly and we’ll give you a number the same day.

Bradford Remodeling Mesquite handles vanity, tile, and fixture installation across the Mesquite area with the same standards we bring to every job: written prices, documented brands, background-checked crews, live phone coverage around the clock, and the 365-Day Done Right Promise in writing. Call (844) 761-8665 for a free estimate – we’ll give you the real range for your bathroom and a written price before any work starts.

Written by the team at Bradford Remodeling Mesquite, serving Mesquite.

Getting started with Bradford in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Mesquite? Licensed & insured · free written estimates
Call (844) 761-8665
Local Service Coverage

Request a Free Estimate in Mesquite

Tell us what you need - Bradford Remodeling Mesquite responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch