A Bradford company - serving Mesquite, NV
A remodeled primary bathroom with a soaking tub and a walk-in shower

Bathroom Remodeling Near Me in Mesquite - One Written Price, No Change Orders

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A home office with a built-in desk and shelves
A remodeled kitchen with a waterfall island and wood cabinets
An open living space after a whole-home remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Bathroom Remodeling Near You in Mesquite, NV

If you’re searching for bathroom remodeling near you in Mesquite, NV, we’re the local crew to call: Bradford Remodeling Mesquite, reachable at (844) 761-8665, with a written price in your hands before any work starts. We serve homeowners across Mesquite and the surrounding communities, and a live person answers the phone 24 hours a day, every day, so you get a real answer the first time you call. No voicemail. No callback queue. No numbers that move once the crew is standing in your hallway.

Most people typing “bathroom remodeling near me” have already been let down by someone. A no-show. A bid that grew legs. A half-finished shower sitting under a tarp for three weeks. We do this differently because The Garrison Standard requires it: every scope, every price, and every guarantee in writing before a tool comes out of the truck. Our technicians bring up to 22 years of experience to the work, and every one of them is background-checked and arrives in uniform, so you know exactly who is coming through your door.

Key Takeaways

  • A written price before work begins, every time, with no on-site surprises.
  • Our 365-Day Done Right Promise covers every completed project: if the work fails inside a full year, we return and correct it at no charge.
  • Background-checked, uniformed technicians with up to 22 years of experience.
  • A live person answers the phone around the clock. Call (844) 761-8665.
  • We install documented, name-brand materials with manufacturer specs and warranties behind them.
A tile setter installing wall tile in a shower

Fast, Local Bathroom Remodeling

Speed matters most when your only working shower has failed and the house is running on one bathroom. We treat it that way. When you call, you get a live person who takes the details, and we move quickly to get an estimate on the schedule. For an active project, we work to keep the disruption short and the timeline honest: our technicians are experienced with the plumbing rough-in, the substrate behind your tile, and the venting a bathroom needs to stay dry in Mesquite’s desert climate, where summers regularly push past 100 degrees and the dry air alone stresses older caulk joints and grout lines faster than most homeowners expect.

Our coverage centers on Mesquite, NV and reaches into Bunkerville, Moapa Valley, and Moapa Town, so if you’re anywhere in this corner of Clark County, we can get to you. We give you scheduling you can actually plan around, and if a job runs into a problem mid-stream, you hear about it from us before it becomes a line item you didn’t approve. That’s the discipline behind the whole thing.

Areas We Cover

Bradford Remodeling Mesquite serves homeowners throughout Mesquite itself, along with bathroom remodeling in Mesquite neighborhoods and the nearby communities of Bunkerville, Moapa Valley, and Moapa Town. If you’re outside those areas, call and we’ll tell you straight whether we can reach you. We won’t book a job we can’t service well. For a look at how we run a full bathroom renovation from demolition to final walkthrough, start with our home page and the services we offer.

A finished backyard cottage with a small covered porch

How Much Does Bathroom Remodeling Cost in Mesquite, NV?

A full bathroom remodel in Mesquite typically runs $9,500 to $28,000 on a guest or hall bath, and $22,000 to $55,000 on a primary suite with a custom shower, freestanding tub, and double vanity. We give you a written price before work starts, itemized line by line, so the number you see on paper is the number you pay. Where most contractors quote you a ballpark that shifts at the door, we put it in ink.

  • Vanity and cabinetry (KraftMaid or Wellborn): $1,800 – $6,500, depending on size and door style.
  • Countertop (Cambria, Caesarstone, or Silestone quartz): $900 – $3,200, including sink cutout and edge profile.
  • Tile and flooring: $1,200 – $5,500 for standard and premium porcelain or ceramic, including substrate prep and waterproofing.
  • Shower and tub work: $2,500 – $9,000 for a tiled walk-in shower with a proper waterproofed pan, or a tub-to-shower conversion.
  • Fixtures (Kohler and Moen): $600 – $2,800 for faucets, shower trim, and a toilet.
  • Drywall, trim, paint, and electrical/plumbing rough-in: $1,400 – $4,800, depending on how much has to be opened up.

Two things drive the number up fast in this part of Nevada: surprises behind the wall, and windows. Older homes around Mesquite sometimes have cast-iron drain lines that are closer to failing than the seller told you, and a bathroom with a west-facing window fights the summer sun, which we plan for with the right moisture-rated finishes. None of that is guesswork on your invoice. It’s itemized, approved, and signed off before we touch it.

How We Build a Bathroom That Lasts

A bathroom is the most moisture-stressed room in the house, which is why the parts you don’t see matter more than the tile you do. We work from the substrate up: cement board or a waterproofed backer behind every wet wall, sealed and finished correctly, so the tile and grout don’t crack loose in a year. We install a documented roster of name-brand materials, including KraftMaid and Wellborn cabinetry, Cambria, Caesarstone, and Silestone surfaces, and Kohler and Moen fixtures. That roster matters because each product carries manufacturer specifications and warranties, and those specs are traceable. When we say a product will perform, there’s a paper trail behind the claim, not just a promise at the sales pitch.

We also plan the airflow. Mesquite’s dry air and temperature swings put real stress on bathroom finishes, and a bathroom with no working exhaust fan will show it in the paint and caulk within a couple of years. If your existing venting is undersized or venting into the attic rather than outdoors, we flag it and put the fix in the scope. A remodel that ignores that is a remodel you’ll be calling someone else about in eighteen months.

What to Check Before You Hire a Bathroom Remodeler

You don’t need a contractor’s license to ask good questions. You need a short list and the discipline to walk if the answers are vague.

  1. A written price, itemized. Ask for the line-item breakdown before anyone starts. A ballpark number over the phone is not a price.
  2. What the guarantee covers and for how long. Ours is written into every project: our 365-Day Done Right Promise means if the work fails inside a full year, we come back and correct it at no charge.
  3. Who shows up. Ask whether the crew is background-checked and what identifies them at the door. Ours are both.
  4. Materials by name. Ask for the brands and get the model numbers. If they can’t tell you, the specs are guesswork.
  5. How the site gets closed out. Clean site, documented scope, and a signed written guarantee in your hand. That’s what a finished job looks like.

FAQs

How fast can you get to my bathroom in Mesquite?

We can usually get an estimator scheduled quickly, often within a couple of days of your call, and our phone line is live 24/7 for scheduling and questions. Call (844) 761-8665 and we’ll tell you exactly what’s available. For active jobs running into a problem mid-project, you reach a live person, not a voicemail box.

Do you serve my area near Mesquite?

We serve Mesquite itself along with Bunkerville, Moapa Valley, and Moapa Town. If you’re in or near those communities, call and we’ll confirm your address and get you on the schedule. If you’re outside our coverage, we’ll say so plainly rather than book a job we can’t service well.

How much does a bathroom remodel cost in Mesquite, NV?

A guest or hall bath typically runs $9,500 to $28,000, and a primary suite with a custom shower and double vanity runs $22,000 to $55,000, for a full gut renovation in the Mesquite market. That range covers cabinetry, surfaces, tile, fixtures, and rough-in. You get a written itemized price before work begins – no numbers that move at the door. Call (844) 761-8665 for an exact quote on your bathroom; estimates are free and there’s no pressure to sign.

Can I reach you after hours?

Yes. A live person answers the phone 24 hours a day, 7 days a week. Call (844) 761-8665 any time, including evenings and weekends, and you’ll get a real answer about scheduling, pricing, or a project already underway.

Ready to Get Your Bathroom Squared Away?

When you’re ready, call (844) 761-8665 for a free estimate. We’ll walk your bathroom, get the real numbers on paper, and give you a written price with the 365-Day Done Right Promise attached before anyone picks up a tool. No pressure, no countdown, no “only two slots left.” Just the scope, the price, and the guarantee, written down and signed. That’s The Garrison Standard, and it’s how we run every job in Mesquite.

Written by the team at Bradford Remodeling Mesquite, serving Mesquite and nearby areas.

What Our Customers Say

★★★★★ 5.0 from 8+ reviews

"Respectful crew. Covered the floors and swept every day."

- Jackie T.

"Home remodel with a new floor plan. Handled structural work and permits without drama."

- Gus R.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A walk-in pantry with wood shelvingA remodeled laundry and mudroom with a bench, cubbies and painted cabinetsA built-in window seat in a bay windowA dining nook with a built-in banquetteA single-story rear room addition with tall windows and a new patioAn open kitchen and dining area after a remodel

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Mesquite? Licensed & insured · free written estimates
Call (844) 761-8665

Request a Free Estimate

Tell us what's going on in Mesquite. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch