A Bradford company - serving Mesquite, NV
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Moapa Valley, NV

Bathroom Remodeling in Moapa Valley - One Written Price, No Change Orders

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A galley kitchen opened up to the dining room with a new peninsula
A remodeled family room with new windows and a window seat
A wide opening with a new beam where the kitchen wall was removed
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Moapa Valley

Bathroom remodeling in Moapa Valley runs $9,000 – $28,000 for a full gut-and-rebuild, and the projects we quote most often here land in the middle of that range once rough-in and permits are squared away. We know this valley’s housing – the older ranch homes in Overton and Logandale, the manufactured units off the highway, the newer custom builds on acreage – and that shape of housing changes how a bathroom gets torn out and rebuilt. Call (844) 761-8665 and a live person answers, any hour. We’ll give you a written price before any work starts.

Call (844) 761-8665

Why Bradford Remodeling Mesquite Is Moapa Valley’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Most of the Moapa Valley we work in is unincorporated Clark County, not a city, and that means the county permits and inspects the work rather than a local building department. Getting an inspector out to this remote corner of the county takes real lead time, and a remodeler who doesn’t plan for it will leave your bathroom torn open for weeks. We plan for it.

Bradford operates under The Garrison Standard – every price in writing before a tool comes out, background-checked and uniformed technicians on every job, and a live person on the phone 24/7. Our technicians have up to 22 years of experience with the kind of work this valley’s housing demands: correcting old rough-in, sistering subfloor joists, and coordinating with the county.

That experience is why homeowners in Moapa Valley call us back for the second bathroom and the kitchen after the first. Every completed job carries the 365-Day Done Right Promise – a full-year written guarantee. If the work fails inside that window, we come back and correct it at no charge.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Walk In Shower in Moapa Valley

A walk in shower in Moapa Valley is often the right call for older ranch homes where the original tub sits in a cramped alcove and a curb-less or low-curb pan opens the footprint up – the job runs $4,500 – $12,000 installed. The scope covers demolition of the old tub or shower, rough-in adjustments for the new drain location, waterproofing the substrate (the backing layer under tile), tile and finish out. Frameless glass enclosures add to the top of that range.

What drives the number

Drain relocation is the big variable. Moving a drain on a slab means cutting and re-pouring concrete; on a raised foundation it’s simpler. We price both before you sign anything. Curb-less conversions in this market tend to sit closer to $9,000 once waterproofing and linear drain work is included.

Why waterproofing matters most here

Intense valley heat and dry air can make a poorly sealed shower pan fail faster than you’d expect when moisture cycles in and out. We use a bonded sheet membrane or liquid-applied system over cement board – never drywall backer – which is the only assembly that holds up through our summers.

Bathroom Remodeling Companies in Moapa Valley

A walk-in pantry with wood shelving

Choosing among bathroom remodeling companies in Moapa Valley comes down to who will price the whole job honestly and pull the county permits. Full bathroom remodels here run $9,000 – $28,000, and the difference between the low and high end is almost never finish selections – it’s what’s behind the drywall. Bradford scopes the rough-in, substrate and permit timeline before quoting, so you aren’t blindsided by a change order.

What a full remodel covers

Demolition, rough-in corrections for plumbing and electrical, new backer board and waterproofing, tile, vanity and fixtures. Cabinetry is set from a documented roster that includes KraftMaid and Wellborn, with Kohler and Moen fixtures and Cambria or Caesarstone tops.

Planning around county inspections

Because Moapa Valley permits through Clark County, we build inspection windows into the schedule. That means one extra communication point with the county – and a real lead time we price in, not absorb mid-project.

Trusted Brands We Service in Moapa Valley

We install to manufacturer specifications using brands with real warranty backing – KraftMaid and Wellborn for cabinetry, Kohler and Moen for fixtures, Cambria and Caesarstone for surfaces. On bathroom exterior elements we work with Therma-Tru doors and Mr-Glass enclosures where the scope calls for it. We don’t stock parts locally, so there’s no wait on a warehouse that doesn’t exist in this valley – materials come from the manufacturer or an authorized supplier on a scheduled delivery, and turnaround is set by the schedule we agree to in writing. If a brand you’re carrying forward is on our approved list, we’ll confirm it before quoting.

Common Bathroom Remodeling Problems We See in Moapa Valley Homes

  • Rot under a ranch-home tub. Decades-old floor coverings hide subfloor rot and prior unpermitted patches, and the only way to know is to open the floor. On older Overton homes we plan for the possibility and price the correction up front.
  • Undersized or failing rough-in. Original plumbing in 1960s-era Logandale homes is often too small for modern fixtures. Replacing the supply and drain lines during the remodel is cheaper than doing it twice.
  • Floodplain elevation on detached builds. Custom homes on acreage often have shop or guest bathrooms affected by foundation elevation and drainage. Grading and drainage plans are part of the scope, not an afterthought.
  • County permit lead time treated as no time. Pricing the job as if it were a Las Vegas tract home ignores the fact that Clark County inspectors have to drive out to the valley. We build that window into the quote.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Bathroom Remodeling in Moapa Valley, NV

We give you a real price range up front. A full bathroom remodel in Moapa Valley runs $9,000 – $28,000. Sub-scope pricing is set out below, and the estimate we hand you is a written number – not a “starting at” that moves. Call (844) 761-8665 for a free estimate on your bathroom; we’ll walk the space, check the substrate and rough-in, and put the price in writing.

Service Moapa Valley Price Range
Bathroom Remodel (full) $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Shower Replacement $3,000 – $8,500
Bathroom Vanity Installation $800 – $3,000

We Also Serve Cities Near Moapa Valley

We serve homeowners throughout the surrounding communities, including Moapa Town, Bunkerville, and Mesquite. If you’re outside the valley and wondering whether we cover your address, call and we’ll confirm it. Explore Bathroom Remodeling in Moapa Valley and our broader service coverage, and reach our Bathroom Remodeling team for a written estimate.

Serving Moapa Valley, NV – Our Local Coverage Area

We serve Moapa Valley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Bathroom Remodeling in Moapa Valley

Get a Written Estimate on Your Moapa Valley Bathroom

An open living space after a whole-home remodel

Tell us what you want to change. We’ll walk the space, check the substrate and rough-in, confirm the county permit requirements, and hand you a written price before any tool comes out. Every job is covered by the 365-Day Done Right Promise – a full-year written guarantee that we correct our own work at no charge. Call (844) 761-8665 for a free estimate. A live person answers, day or night.

Written by the team at Bradford Remodeling Mesquite.

Why Moapa Valley Chooses Bradford Remodeling Mesquite

We set the standard for bathroom remodeling in Moapa Valley.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Moapa Valley

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Moapa Valley Customers Say

Trusted by homeowners across Moapa Valley and surrounding areas.

★★★★★

"Respectful crew. Covered the floors and swept every day."

Jackie T.
★★★★★

"Home remodel with a new floor plan. Handled structural work and permits without drama."

Gus R.
★★★★★

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

Tricia S.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
An open kitchen and dining area after a remodelA whole-home remodel with the living, dining and kitchen areas opened upA second-story addition that matches the existing rooflineA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled primary suite with built-in wardrobes and a window seatA garage converted into a guest room and home office

More remodeling services in Moapa Valley

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Moapa Valley?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Moapa Valley.

(844) 761-8665

Request a Free Estimate in Moapa Valley

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch