A Bradford company - serving Mesquite, NV
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Backsplash, Tile & Flooring in Mesquite, NV

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled primary suite with built-in wardrobes and a window seat
A garage converted into a guest room and home office
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Backsplash, Tile & Flooring in Mesquite, NV

Backsplash, tile and flooring work in Mesquite typically runs $1,400 to $6,500 for a kitchen backsplash, and $4 to $14 per square foot installed for floor tile, depending on material, substrate condition and layout. This is finish work: the tile you look at every morning, the grout line that either sits dead level or doesn’t, and the floor that has to survive Mesquite’s dry heat and hard water without cracking or staining.

Bradford Remodeling Mesquite handles backsplash, tile and flooring as part of a larger Kitchen Remodeling scope or as a standalone finish upgrade. We put the price in writing before a single box gets opened, and every completed job carries the 365-Day Done Right Promise: if the tile or grout fails inside a full year, we come back and correct it at no charge. Call (844) 761-8665 for a free estimate.

Key Takeaways

  • Backsplash installs in Mesquite usually land between $1,400 and $6,500 depending on tile type, square footage and how many outlets and windows we have to cut around.
  • Floor tile runs roughly $4 to $14 per square foot installed, material included, with porcelain at the low end and large-format stone or heavy-texture tile at the top.
  • Every Bradford job gets a written price before work starts and a written 365-day guarantee when we close.
  • Our technicians have up to 22 years of experience with substrate prep, mastic and thinset selection, and grout that holds up in desert humidity swings.
Installers leveling a new base cabinet during a kitchen remodel

When You Need Backsplash, Tile & Flooring

Finish work is usually the last thing homeowners think about and the first thing guests notice. Here’s when it’s time to call us:

  • Cracked or hollow-sounding floor tile. Mesquite sits on expansive desert soils, and slab movement shows up first in tile. If you hear a hollow tap underfoot or see a hairline crack running across three or four tiles, the substrate under them has already shifted.
  • Grout that’s stained, crumbling or growing dark lines. Hard water and mineral-heavy irrigation here are hard on grout joints, especially around sinks and near the back door where dust gets tracked in.
  • A backsplash that predates your cabinets. If you’ve updated cabinets or counters and the old 4-inch builder backsplash is still behind them, the whole wall reads unfinished.
  • Peeling or lifting backsplash tile near the cooktop. Heat and years of grease exposure will loosen adhesive before the tile itself fails. That’s a substrate problem, not a tile problem.
  • Planning a full kitchen refresh. Backsplash, floor and counter are the three finishes that make or break a kitchen, and they’re best planned together so material tones and grout lines match. That’s the stage where a call to our crew saves you the most.
  • Bathroom or entry tile that’s outlived its waterproofing. If a shower or entry floor is 15-plus years old, the waterproof membrane behind the tile has likely aged out even if the surface still looks passable.

Our Backsplash, Tile & Flooring Process

We run every tile job on the same disciplined sequence. No surprises, no mid-job price changes.

  1. Walk-through and written price. We measure the space, check the substrate, and write a line-item price before we leave. That price is the price.
  2. Material selection with documented brands. We work with Silestone and Caesarstone for coordinated quartz surfaces, and Kohler and Moen fixtures where a sink or faucet is part of the job, so specifications are traceable and manufacturer warranties back our own.
  3. Demo and substrate prep. We pull the old tile, inspect the substrate (the surface the tile bonds to), repair any soft spots or leveling issues, and set the waterproofing where it belongs. Skip this step and the tile fails in a year. We don’t skip it.
  4. Layout and dry-fit. Before a single tile gets set, we lay out the pattern, check grout line spacing, and confirm cuts around outlets and windows. Layout decisions get made with your eyes on them, not mid-install.
  5. Install and grout. Tiles get set with the right thinset for the material and location, then grouted and sealed. We tape and protect surrounding surfaces through the whole job.
  6. Clean close and signed guarantee. We haul out debris, clean the site, walk you through the finished work, and hand you the signed 365-Day Done Right Promise in writing.

For a broader look at how tile fits into a full kitchen scope, see our Kitchen Remodeling in Mesquite page, which lays out how finish selections connect to cabinetry, counters and lighting.

A low-threshold walk-in shower with a bench and grab bar

Backsplash, Tile & Flooring Pricing in Mesquite

Here are honest ranges based on the Mesquite market. Every number below is a starting point for a written quote, not a ceiling:

Scope Typical price range
Kitchen backsplash, standard ceramic or porcelain, 30 – 50 sq ft $1,400 – $3,200
Kitchen backsplash, glass, mosaic or large-format tile $2,800 – $6,500
Floor tile installed, porcelain, 150 – 300 sq ft $4 – $8 per sq ft
Floor tile installed, large-format or natural stone $9 – $14 per sq ft
Substrate repair or leveling (per area) $300 – $900
Old tile removal and haul-away $400 – $1,200

What moves the number: tile material and size, how many outlets, windows and corners we cut around, whether the substrate needs repair, and whether we’re pulling old tile. A 4-inch builder backsplash on a flat wall with minimal cuts is a different job from a full-height mosaic wall with three outlets and a window return. Both get a written price before we start.

We don’t quote “affordable” as a slogan. We quote an actual range, put it in writing, and stand behind the number when the job is done. Call (844) 761-8665 for a free estimate.

Why Bradford Remodeling Mesquite

Bradford is part of the Garrison Partners family, established in 2004, and every location is independently owned and operated under The Garrison Standard. That framework is simple: every price in writing before work starts, every completed project backed by the 365-Day Done Right Promise, and background-checked, uniformed technicians on every job. The phone is answered by a live person 24 hours a day, seven days a week – not a voicemail, not a callback queue.

Our technicians have up to 22 years of experience with tile layout, substrate prep, and grout and sealant selection for desert conditions. If you’re comparing us against another Mesquite tile installer, ask that installer to put their price in writing and hand you a guarantee on the back end of the job. We do both, every time.

For related work in nearby areas, see our home page, which covers the full scope of what we do for homeowners across the region. If your project includes countertops or a full cabinet refresh alongside the tile, our Kitchen Remodeling in Mesquite guide walks through how finish work ties into the rest of the kitchen.

Every project we close leaves the site clean, the scope documented, and a signed written guarantee in the homeowner’s hand. That’s what squared away looks like: no loose ends, no follow-up repair calls in six months, and a floor and backsplash that will hold.

FAQs – Backsplash, Tile & Flooring

How much does a tile backsplash cost in Mesquite?

A standard kitchen backsplash in Mesquite typically costs $1,400 to $3,200 for ceramic or porcelain, and $2,800 to $6,500 for glass, mosaic or large-format tile. The range depends on square footage, tile material, and how many outlets, windows and corners we’re cutting around. Call (844) 761-8665 for an exact quote. Estimates are free.

Can you install tile over existing tile in Mesquite?

Sometimes, yes, but we check the substrate first and it’s not always the right call. Installing over existing tile adds height to the floor, which can trip door thresholds and leave grout lines that don’t line up with adjacent rooms. If the existing tile is sound and flat, we can build up over it with the right adhesive; if there’s any hollow or cracked tile beneath, we remove it. That decision gets made in the walk-through, and it’s included in the written price before we start.

How long does a kitchen backsplash install take?

Most kitchen backsplashes take two to three days: one day for prep and layout, one for install, and a half-day to a day for grout, seal and clean-up. Larger mosaic jobs or walls that need substrate repair can run four to five days. The written scope includes a start date and a target finish date, so you know what to expect going in. Call (844) 761-8665 to schedule a walk-through.

Does the 365-Day Done Right Promise cover tile?

Yes. Every completed tile and backsplash job is covered by a full-year written guarantee. If the work fails in that window – a cracked tile from a bad substrate bond, grout that crumbles, a sealant that lifts – we come back and correct it at no charge. The guarantee is handed to you in writing at job close, not left as a verbal promise. Call (844) 761-8665 for a free estimate.

Written by the team at Bradford Remodeling Mesquite, serving Mesquite.

Getting started with Bradford in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Mesquite? Licensed & insured · free written estimates
Call (844) 761-8665
Local Service Coverage

Request a Free Estimate in Mesquite

Tell us what you need - Bradford Remodeling Mesquite responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch